There are so many factors when it comes to any design project that there is no “one fits all” project timeline. Factors such as scope, client decisiveness, product lead times, and construction delays all play a role in crossing the finish line.
Today, I’m sharing 5 steps to take to help determine how long your dream home will take.
1. Consult the Pros
We do this for a living so chances are, your design team will have a better idea of any project timeline from just a few conversations. Be sure to fill out any questionnaire given to you and answer any questions with any and all details so that there will be no surprises mid-way through construction.
At Kozy, our first step is always always a discovery call with a potential client. We can learn more about your project, project goals, and design style. After this meeting, we define the scope of work and provide an estimated timeline based on the information gathered. If you have an initial design consultation, this is where we can take a look at your space, determine the scope, and talk about some initial design ideas.
2. Determine the Scope
So what exactly is the scope of work? The scope defines every single detail Kozy will touch on during your project. The details and quantity will determine how long the project will take. We always say that scope determines timeline. A good rule of thumb is one month per space.
We do this for a living so by now Kozy has a pretty good idea of how long 1 room with full furnishings will take vs. a full home. Once we know the scope of your project, we can give you a better estimate of the project timeline.
3. Factor in Lead Times
Shipping delays? Oh my! Industries across the board have all been impacted by Mrs. Pandemic which of course has impacted the design industry too. Lead times have also impacted by production and shipping delays. It’s important to order products as early as possible to allow for any potential delays.
Since all projects are different, it’s important for Kozy to have all the information for all parties involved to determine an accurate timeline. The more information we have, the better.
4. Understand All Schedules
Like we said above, any and all parties involved in your project should be in cahoots. Again, this means the design team, clients, contractors, and any other trades that will be involved in your project. We always say that communication is key and it’s important for everyone to be on the same page.
At Kozy we are open to working with any trades looped in by the client. We do not have our own construction team but we do work with some amazing contractors in the Austin area. We always recommend our clients use a contractor that they trust and have worked with before.
5. Prepare to be Flexible
Project timelines are always an estimate and never exact. We usually come pretty close though. That said, be prepared to be flexible. For example, in Texas, we’ve had snow storms in February and summer storms that have caused construction delays. We can’t control the weather but we can control how we react to it. That’s why we always say to be prepared for the unexpected.
Another example is finding mold in your shower walls when removing old tile to replace it with some cool new tile. That’s a surprise no one wants, but it happens. Again, be prepared to be flexible.
We do this for a living and handle all the dirty work so you don’t have to worry. The result in the end is always worth the effort, my friends!